
Residents and commuters traveling through the Epperson community are beginning to see long-anticipated improvements finally taking shape along Overpass Rd., the main east–west corridor connecting Epperson Blvd. to Curley Rd.
Construction is currently under way to widen this short, but critical stretch of roadway, a project that aims to significantly improve traffic flow, safety, and daily travel times for the growing northern Wesley Chapel area.
When finished, the work being completed by Epperson developer Metro Development Group will allow this portion of Overpass Rd. to transition from its current two-lane divided configuration to a four-lane divided roadway, with an additional through lane added in each direction.
This expansion reflects the rapid growth of the Epperson community and surrounding areas and the increasing traffic volumes, especially during peak morning and afternoon hours.
One of the most impactful changes is occurring at the signalized intersection of Overpass Rd. and Curley Rd. Additional eastbound left-turn lanes are being added so that two eastbound through lanes will be able to continue straight through the intersection.
This improvement will align the roadway configuration with the existing layout on the opposite side of Curley Rd. in the Watergrass development, eliminating a common bottleneck that has caused backups during busy times of day.

In conjunction with the widening project, a new traffic signal has been installed at Overpass Rd. and Epperson Blvd., replacing the former four-way stop located in front of the entrance to the Epperson lagoon. This signalization is expected to enhance safety and improve traffic operations at one of the community’s most active entrances, benefiting residents, visitors, pedestrians and bicyclists alike.
Perhaps the most welcome news for daily commuters is what comes next. Once construction has been completed, the existing eastbound right-turn-only lane along Overpass Rd. (approaching the new signal) will be re-striped and converted into an additional through lane.
This change will allow traffic to move more efficiently eastbound, particularly during peak travel hours, and should substantially reduce the delays that drivers have been experiencing.
While construction can, of course, be just as inconvenient, these improvements represent a major investment in the area’s transportation infrastructure — facilitated with private funds instead of taxpayer dollars.
The expanded roadway, improved intersections and upgraded signalization are designed to support continued growth while making everyday travel smoother and safer.
Motorists are encouraged to remain patient during the construction, follow posted signage and exercise caution while crews complete the work. Although we don’t know exactly when the work is expected to be completed, it will be in 2026, so residents can look forward to a more efficient and commuter-friendly drive through the heart of their Epperson community soon.

