Back in December, Wiregrass Ranch submitted plans for an a new east/west access road through parcel M3 (see map, bottom right), which was intended to help provide access to a proposed new PAM Health Rehabilitation Hospital and future outparcels. This road will connect with Bruce B Downs (BBD) Blvd., at the directional median opening that aligns with Stockton Dr. on the other side of BBD.
In the future ultimate build-out, it’s intended that this road might be punched through the wetland and connected directly as an extension to the existing Bella Corsa Blvd in Estancia at Wiregrass. This extension will serve two functions —
1) to give residents direct vehicular and pedestrian access to the large commercial developments and reduce traffic on the main roads, and 2) to give residents an alternative way to access BBD.
The proposed PAM Health Rehab Hospital will be located immediately north of the Amberlin Apartments site (on the other side of the natural wetland pond) and, even though the plans don’t currently show it, it will be required to be cross connected to Amberlin and the small commercial retail outparcel to the south (M3 Outparcel B site) with a small road, which will allow this rehab hospital (and all of the future Wiregrass commercial) to have access to the signal at Eagleston Blvd. upon ultimate buildout.
Plans for the small retail outparcel to the south show this future cross connection which also would include sidewalk access. This retail development (Outparcel B) will be a small multi-tenant plaza whose future tenants are currently unknown but could be a mix of retail and a small restaurant.
In addition, construction plans for the Ace Medical Plaza (M3 Outparcel C) were just submitted to the county in February. This site is located immediately in front of Amberlin and will be a two-story, 15,000 sq.-ft. building occupying Outparcel C of the Wiregrass development, at the southeast corner of BBD and Eagleston Blvd.