The oft-argued merits of a connection point between Wesley Chapelโs Mansfield Blvd. and New Tampaโs Kinnan Dr. is set to get a new look, but that wonโt be the only route back and forth between Hillsborough and Pasco counties that the Pasco County Metropolitan Planning Organization (MPO) plans on looking at in less than two weeks.
The MPO will hold an open house-style meeting on Tuesday, April 18, 5:30 p.m.-7:30 p.m., at Pasco-Hernando State College (PHSC)โs Porter Campus at Wiregrass Ranch, in order to gather public comments and other information to be used in the upcoming Wesley Chapel Roadways Connections Study.
The study is designed to evaluate the pros and cons of three potential roadway connections between Wesley Chapel and New Tampa (red circles on map above):
Mansfield Blvd. & Kinnan St., a long sought-after connection by many in the Cross Creek and K-Bar Ranch area, though it also has its share of opponents.
Meadow Pointe Blvd. & the Meadow Pointe Blvd. extension, which leads right into the planned K-Bar Ranch Blvd. and would provide easier access to Morris Bridge Rd.
Wyndfields Blvd. & the Wyndfields Blvd. extension, which would also connect directly to both K-Bar Ranch Blvd. and Morris Bridge Rd.
โWe are just starting the process, and the purpose of the first meeting is to get public input about what issues there are on both sides,โโ says Pasco County transportation engineer Ali Atefi, P.E.
Kinnan St. and Mansfield Blvd. have been separated by about 50 feet of grass, trees and sometimes garbage, for years. In 2016, Pasco County District 2 commissioner Mike Moore and then-Tampa District 7 City Council member Lisa Montelione met to discuss connecting the roadways, but those talks stalled.
New District 7 City Councilman Luis Viera made the connection point one of the staples of his winning campaign, and continues to say he would like to push to bring the roads together.
โFrom both sides, we have had a request for a connection and, weโve had people that donโt want to connect,โโ Atefi says. โBut, these connections are shown on our long range plans and we want to do an in-depth study and figure out the positive and negatives.โ
The open house, which Atefi says โis not a debate,โ will include an MPO summary at 6 p.m., followed by an opportunity for those attending to examine area maps and to voice their opinions. Stations will be set up, and representatives from Pasco County Planning & Development, the MPO and the consulting team will be available to answer questions.
The public is welcome to drop in anytime between 5:30 and 7:30.
Atefi says other meetings will be held in the future, and the public will also be encouraged to take online surveys to help determine what, or if any, connections should be made.
The PHSC-Porter Campus at Wiregrass Ranch is located at 2727 Mansfield Blvd. in Wesley Chapel. For more information about transportation planning in Pasco County, visit the MPO website at PascoMPO.net.





More than 1,000 parents and students streamed into Wesley Chapel Highโs gymnasium Tuesday night, all hoping to convince Pasco County administrators that the recommended plan for school rezoning of their communities โ Option 12 — was a bad one.
Option 12 fills the new school with mostly students living west of I-75, but to relieve overcrowding at Wiregrass Ranch High and John Long Middle, also re-zones students who live in neighborhoods with access to Meadow Pointe Blvd. (north and south of S.R. 56), which affects families in Meadow Pointe III and IV, Country Walk, Union Park and other communities.
Students who will be seniors next year donโt have to change schools, but their siblings who are incoming freshman or rising sophomores or juniors will have to. โFriday night is going to be very hard,โโ the mom said, with one student performing in band at WRH while the other is performing at the same time at WCH.It was suggested the county consider grandfathering in siblings of seniors to prevent this.
According to Williams, that is not true. He says there are two Seven Oaks residents on the SBC, and they were chosen by the school principals from WRH and JLM, who were allowed to pick two parents apiece. Williams added the county had nothing to do with those choices, and that trying to choose a parent from every community that might be affected would create chaos.However, the lack of Meadow Pointe representation on the SBC was a sticking point for a number of parents in the crowd Tuesday night. One parents yelled out โItโs rigged!โ
The two have already submitted proposals. Williams says he has received a handful of similar proposals from community leaders, and all have been forwarded to the SBC members.McClanahanโs proposal says that Option 13 reduces the overcrowding of every school below their current levels (Option 12 leaves WCH and TWM over capacity) and provides a more equitable distribution of students. The nine-page report was submitted to the SBC and the school board.
Proponents of each of those options turned Tuesday night into a battle between 13 and 20. But to use a football analogy, it all reminds me of an NFL review of a questionable reception.

Although the Raymond James campus was originally scheduled to begin building in 2012, with the first 100 employees arriving by 2014, the project stalled.

